What a construction estimate tells you before you build

Read the quantities, rates and exclusions together to understand what a quoted total actually covers.

Start with the drawing revision

Check the date or revision of the drawings used. A change in floor area, wall position or finish can affect several quantities at once.

Read one item from start to finish

For a flooring item, find the unit, measured area, specified material and rate. Check whether the rate includes laying and associated work before comparing it with another quote.

Ask about work outside the total

Site preparation, boundary walls, utility connections or particular finishes may be listed separately. Ask for an explicit list and decide how to account for those items in your budget.

Compare like with like

Put two estimates side by side, align items with the same specifications, and mark remaining differences. Revisit the estimate when the design or site conditions change.