Approvals and land use
Building map approval assistance
Get help preparing a building-plan application for the authority responsible for your plot.
Discuss your projectIllustrative sample
Building-plan file review

A proposed home has a floor plan and a plot sketch. Before the application is prepared, the two drawings need to agree.
- Plot sketch
- The lane runs along the east boundary. The sketch shows the gate on that side.
- Floor plan
- The entrance is marked, but the drawing has no north arrow to relate it to the lane.
- Open item
- Confirm orientation against the site survey and update the plan before assembling the application set.
Draft held for drawing coordination.
How Meeraj can help
Review available drawings, identify missing information and discuss the preparation and coordination your application needs. The competent authority decides the application.
What to bring
- Plot location and available ownership records
- A dimensioned sketch and any earlier sanctioned plan
- Letters received from the authority
Is preparing a drawing the same as getting map approval?
Preparing a drawing records the proposal. Approval is a separate decision by the relevant authority after it considers the application.
When to get in touch
A new proposal, an addition or a change to an existing building can raise different questions. The first step is identifying the plot and the nature of the proposed work.