Plan and build
Structural engineering
Coordinate the structural requirements of a proposed building or alteration with its layout.
Discuss your projectIllustrative sample
Stair opening coordination note

On a home alteration drawing, the proposed stair meets an area labelled as an existing upper floor.
- Drawing query
- The plan shows the new stair, while the section still shows a continuous floor at the landing.
- Existing records
- The drawings supplied for review do not show how this part of the floor is supported.
- Review owner
- The structural engineer will inspect the existing arrangement. The architect will coordinate the plan and section after review.
Decision pending
Stair location remains open until the engineer records the review.
How Meeraj can help
An engineering scope for the available plans, with required site information and structural deliverables identified for the engagement.
What to bring
- Latest floor plans and intended building use
- Available ground investigation information
- Earlier structural drawings or records
What if the existing building has no structural drawings?
Tell us which records are missing. The engineer can discuss site inspection and the information needed before advising on the proposed work.
When to get in touch
Discuss structure before finalising spans, column positions or changes to an existing building. The engineering brief depends on the site, intended use and design stage.